NEW PRODUCT INNOVATIONS Cam Units

140 3 4 5 6 8 7 2 1 subject to alterations DIE MOUNT CAM FCC-HV 2016.15. ASSEMBLY INSTRUCTIONS STEP 1  Remove the locking screw (1) and remove the gas spring (2) from the hole Caution The gas spring may only be removed if the spring itself is released. After removing the locking screw for the gas spring, note that there is a risk of crushing between the cam slide unit body and the cam slide unit bed due to independent movement of the cam slide unit body. STEP 2  Slide the cam unit driver into the front position Caution Risk of crushing between the cam unit driver and the cam unit base by movement of the cam unit driver. STEP 3  Remove the cam stop  Insert Lock-Out system (4) and secure with the screw (5)  Insert Lock-Out sleeve (6) and secure the cam slider with the screw (3). This position corresponds to the closed position (working position) in the tool. Caution In the traditional tool setup process (pressing the cam driver in the tool), the forced retractors on the left (8) and right (7) must also be removed to avoid damaging the cam slide unit, cam driver and tool.

RkJQdWJsaXNoZXIy MTIwNzY0